Mine Structures Lifted
|
The counter-weight tower base, was relevelled by the Uretek Method.
Uretek Relevels and Resupports Various Mine Structures Fast!
With minimal down-time, we raise, relevel and resupport moving & sunken stacker-reclaimer rails, conveyor belt towers, machinery, driveways, floors and whole buildings!
- Unique, fast, expanding structural resin injection!
- Safety issues are addressed fast, effectively and economically!
- Costly closures are eliminated; down-time is reduced to a minimum.
- Trip hazards and slab movement are eliminated.
- Machinery base slabs are relevelled and given renewed support.
- Uretek work takes only a fraction of the replacement time.
Minimal Downtime When Uretek Relevels Mine Structures
Conveyer belt pedestal bases and many other massive structures can be raised, re-levelled and re-supported by Uretek resin injection. Sometimes weak strata need to be strengthened at a depth of 14 metres or more. That is no problem.
Great weight is not a problem either: it’s an advantage, as it allows greater compaction of the foundation ground.
For many years now Uretek have been raising re-levelling and re-supporting on-ground and in-ground mine-site structures, including these:
- Coal loader towers
- Conveyer belt pedestal bases
- Rock-breaker footings
- Rail index machine slabs
- Vehicle service centres & garages
- Office buildings
- Conveyer belt counter-weight towers
- Railway lines
- Engineering workshops
Uretek Addresses Mine Site OH & S Issues Fast!
With Uretek many OH&S issues can be addressed fast and effectively. Uretek injection is an effective way to eliminate trip hazards and correct out-of-level structures. Uretek rectification can also often remove the need for replacing slabs and structural elements, so saving both time lost from production and the cost of replacement.
Uretek Fixes Mine Problems All Over Australia and New Zealand
Mines, particularly in outback Australia, present challenges on an impressive scale. Logistics can demand days of driving and freighting of materials. Needs can be unusual, loads colossal, deadlines onerous, responsibilities huge! Uretek meets these challenges on a regular basis.
In The Pilbara, WA, we have corrected multiple deformations in rails carrying ‘monster' stacker-reclaimers. In The Hunter, we have also relevelled deformed stacker-reclaimer rails that prevented loading vast quantities of stockpiled coal.
In another remote Western Australian mine, we have strengthened the ground and lifted 1500 mm thick concrete indexer rail slabs servicing 2 kilometre long iron ore trains carrying over 200 tonnes per wagon.
We have strengthened escape shafts, relevelled massive steel tower structures, re-plumbed silos and treated deteriorating workshop floors that service 100 tonne dump trucks.
Uretek offers many unique and patented solutions to the mining industry: relevelling stacker-reclaimer rails, machinery, conveyer belt structures etc.
See also
- Factory & Warehouse Floor Repair
- Driveways Relevelled
- Parking Areas Relevelled
- Sunken Floors
- Uretek Processes
- Reducing Down-time at mine sites
- Mine Crushing Plant Stabilised
Uretek Ground Engineering
Uretek solves many problems by unique and patented systems of resin injection.
Fast, economical, long-lasting, environmental and with minimal disruption.