Crane rails re-supported
Click to enlargeClick to enlarge
Click to enlargeClick to enlarge

URETEK work includes re-supporting, raising and re-levelling of wharves, warehouses, hardstands, and even whole buildings.

Loss of support often results from subsidence, washaways or increases in static or dynamic loads.

Proper support is increased or re-established by strengthening the foundation ground. And slabs can be raised and re-levelled with lifting capacity over 50 t/m2, if required.

Very large voids may be filled with Benefil light weight engineering grout.

Major benefit: The URETEK Method is fast and involves minimal interruption to port operations.

We can correct one section at a time and/or work at low traffic periods. Corrected areas are trafficable again in just 30 minutes!

  • MINIMAL DISRUPTION

  • ECONOMICAL

  • PERMANENT