Click to enlargeClick to enlarge
Click to enlargeClick to enlarge
Click to enlargeClick to enlarge

A whole variety of on-ground structures are re-supported, raised and re-levelled by The URETEK Method - quickly, economically and with minimal disruption.

Less common situations for URETEK correction include: re-levelling and re-supporting base slabs for transmission towers and wind-farms; base supports for coal loaders, weigh-bridges and cranes; solidifying rock-built weirs; and raising and re-supporting sunken lift-well pits.

Fully self-contained operations units can travel by road, rail or sea.

URETEK work is fast! - Most jobs are done in a day or two.

Generally your operations can continue while we’re working - we treat one area at a time and work at night, if required. No excavation. No mess, dust or water.

Slab deterioration is arrested and re-support is established quickly and economically.

  • FAST

  • CONVENIENT

  • LONG-LASTING

  • ECONOMICAL